Skip to content

The process

From quote to handover.

Five stages from the first look to the last touch-up. Most of a good finish happens before the final coat goes on.

The five stages of a painting job

Bedroom wall in a dark grey-blue around a timber-framed window, before a repaintRoom ready for painting: drop sheets down, skirtings taped off and a work platform in placeRoom after the spray-out, with paint tins sitting on the bare slabFinished hallway in a new build with white walls, doors and architravesFinished living room with white walls, black-framed windows and a skylight
  1. Bedroom wall in a dark grey-blue around a timber-framed window, before a repaint

    Look and quote

    Kyle looks at the job, the surfaces and the timing, then sends a free quote. Photos and the suburb are enough to start the conversation.

    Ask for a free quote
  2. Room ready for painting: drop sheets down, skirtings taped off and a work platform in place

    Protect and prepare

    Floors and fittings covered, edges masked, then defects patched, filled and sanded until the walls read flat.

    Drop sheets go down, edges are masked and furniture is moved or covered before any sanding or painting starts.

    More on interior repaints
  3. Room after the spray-out, with paint tins sitting on the bare slab

    Spray out and undercoat

    On new builds the house is sprayed out before fit-out: walls and ceilings undercoated, ceilings taken through to their top coats.

    With nothing in the way, the whole house is sprayed out: walls and ceilings undercoated, and ceilings taken through to their top coats. It is the fastest point in the build to get an even, full-coverage base.

    More on new builds
  4. Finished hallway in a new build with white walls, doors and architraves

    Finish coats

    Once fit-out is done, the walls, doors, architraves and skirtings get their finish coats in premium trade paint.

    The finish on a sprayed door depends on the prep time behind it. Recent jobs include a run of internal doors and a front door, both sprayed.

    More on spray finishing
  5. Finished living room with white walls, black-framed windows and a skylight

    Touch up and hand over

    Marks and knocks from other trades are touched up, then the job is finished off.

    Knocks from other trades, marks from moving in, patches before a sale or a rental inspection.

    More on prep and touch-ups

Between the two stages

"Now just waiting for fit out to be done and then we will finish the whole job off."

Spray day

New build or repaint.

The order changes with the job. Here is how the two most common ones run.

On a new build

  1. Before fit-out

    With nothing in the way, the whole house is sprayed out: walls and ceilings undercoated, and ceilings taken through to their top coats. It is the fastest point in the build to get an even, full-coverage base.

  2. After fit-out

    Once cabinets, doors and trims are installed, the walls get their finish coats and the woodwork is done. Knocks and marks from the other trades are patched and touched up at the same time.

New build painting

On a repaint

  1. Protecting the house

    Drop sheets go down, edges are masked and furniture is moved or covered before any sanding or painting starts.

  2. Dark to white

    A recent repaint took a bedroom from a dark grey-blue back to a clean white. Dark colours need enough coats to stop them ghosting through, so the job is planned for that from the start.

Interior repaints
Call KyleGet a free quote